Featured case study
“This project has seen the introduction of the PAS2035 standard. From supply chain engagement through to energy efficiency modelling. They offered speedy solutions to aid in the progression of the project. I look forward to working with VOR during the delivery phase of the project. “
– Lee Wood, SHDF Project Manager, Unitas
See all case studies
Wellington Hill
Process VOR approached the project by conducting a retrofit assessment of the property’s current condition … Read more
Two Rivers Housing
Process The SHDF Demonstrator projects saw the introduction of PAS 2035, with VOR ensuring that … Read more
Equans – West Midlands
Knightstone Heights is a block of six energy inefficient flats in Frome, Somerset. VOR Group were engaged to assess the whole block to establish if it would be eligible for SHDF funding and to provide full PAS 2035 service to support the application.
Livewest – Knightstone Heights
Knightstone Heights is a block of six energy inefficient flats in Frome, Somerset. VOR Group were engaged to assess the whole block to establish if it would be eligible for SHDF funding and to provide full PAS 2035 service to support the application.
Livewest – Trewyn Flats
Trewyn Flats are a group of 16 flats, situated over two floors and connected by multiple corridors, in St Ives, Cornwall. VOR group were engaged to carry out full PAS 2035 services on the dwellings.
Unitas – Stoke on Trent
VOR group were commissioned to carry out full PAS2035 services on 74 terraced and semi-detached properties, many with adjoining private properties, on the Newford Estate in Stoke on Trent.
East Lindsey District Council
Our scope of works includes undertaking an archetype assessment of the proposed properties, completing energy modelling and producing an outline performance specification to define the mix of measures appropriate to each archetype setting out U-values and performance / technical parameters…
Somerset West and Taunton Archetype Study
Installation of External Wall Insulation (EWI) would potentially impact the look of these traditional buildings and there were multiple constrains to the façade which made EWI a difficult install…